PDC cutters and cutting elements for drill bits are currently supplied to the Kazakhstan market predominantly through imports. At the same time, local-content requirements apply to goods and services in the oilfield services sector.

The project aims to localize the production of PDC cutters and cutting elements for drill bits
in the Republic of Kazakhstan, reduce dependence on imported supplies, and establish a basis for the development of domestic production.
Subject to meeting the applicable requirements, SIC plans to obtain domestic producer status in accordance with the legislation of the Republic of Kazakhstan.

1. Technology — To acquire HPHT PDC cutter synthesis technology from a qualified international technology partner, including equipment supply, technology transfer, and personnel training.
2. Quality and technical requirements — To establish a quality management system in accordance with API Q1 and ensure that the products meet applicable industry standards, technical requirements, and customer requirements.
3. Demand validation — To engage with potential customers to identify technical requirements, supplier qualification procedures, testing requirements, and prospects for the use of SIC products.
4. Production site — the final production site is still under evaluation; several industrial sites in the Republic of Kazakhstan with developed power infrastructure are under consideration.
5. Bit assembly — In line with Kazakhstan’s registry of domestic producers, the first phase combines PDC cutter production with the assembly of steel-body PDC bits using SIC’s own cutters. Further localization of bit manufacturing follows confirmed demand.

The project provides for the production of PDC cutters and cutting elements in standard sizes of 13, 16 and 19 mm using high-pressure, high-temperature (HPHT) synthesis.
Both flat and shaped (non-planar) cutters are part of the technology package requested from the technology partner.

The project is currently at an early stage of implementation. SIC is currently:
• validating potential demand and customer requirements;
• holding discussions with potential technology partners;
• developing the production localization concept;
• engaging with government bodies and development institutions;
• establishing the basis for subsequent technical and financial development of the project.
At this stage, the priority is to validate market requirements, the technological configuration, and localization conditions before making decisions on the project’s further production and investment structure.